REMOTE CONTROL & MONITORING SYSTEMS

In the new issue of the ECOTEC magazine an article was published concerning one of the first projects undertaken by CONSTRAT in cooperation with AYTOMATION LINK for the management of solid waste. Constrat undertook the design and control of the factory automation system helping the project...

Contract signing for the implementation titled:   "SUPPLY, INSTALLATION AND COMMISSIONING OF A REMOTE CONTROL SYSTEM - REMOTE CONTROL AND LEAKAGE DETECTION OF THE INTERNAL WATER SUPPLY SYSTEM OF THE MUNICIPALITY OF GORTYNA”. THE PURPOSE OF THE SYSTEM IS: The continuous monitoring and supervision of important operating parameters of...

Contract signing for the implementation titled: ‘’SUPPLY, INSTALLATION, REMOTE-CONTROL AND LEAK DETECTION MONITORING SYSTEM OF THE EXISTING EXTERNAL AND INTERNAL WATER NETWORK OF THE MUNICIPALITY OF SARONIKOS’’   Program:             FILODIMOS I Group:                 B Priority Axis:       Infrastructures’ of water supply networks improvement Budget:               2,993,326.75 € (excluding VAT) Funding:              Ministry of Interior   The contract aims...

Contract signing for the implementation titled: ‘’SUPPLY, INSTALLATION, REMOTE-CONTROL AND LEAK DETECTION MONITORING SYSTEM OF THE EXISTING EXTERNAL AND INTERNAL WATER NETWORK OF THE MUNICIPALITY OF IERAPETRA’’   Program:  Transport Infrastructure, Environment and Sustainable Development Budget: 700,000.00 (Vat excluded) Funding: Ministry of Environment and Energy   The purpose of the implementation is: ...

CONTRACT SIGNING OF THE MUNICIPALITY OF AGIOS VASILIOS. Contract signing for the implementation titled: ‘’Supply, installation and startup a system of the remote-control and leak detection of the water supply network of the municipality of Agios Vasilios and replacement-extension of the water supply network of p.c. Asomatos’’   OPERATIONAL...

Contract signing for the implementation titled:   ‘’Supply, installation and startup a system of the remote-control and leak detection in consumption measuring devices, of the water supply network of D.E.Y.A. ERETRIAS’’       Operational Program:                     FILODIMOS I GROUP:                                              B PRIORITY AXIS:                                  IMPROVEMENT OF WATER SUPPLY’S SUBSTRUCTURES BUDGET:                                            2,994,093,00 € (excl. VAT) FINANCING:                                       MINISTRY OF...