SUPPLY AND INSTALLATION OF A TELEMETRIC SYSTEM FOR THE MONITORING AND AUTOMATIC CONTROL OF THE HYDRAULIC PARAMETERS OF THE WATER SUPPLY NETWORK OF AGIAS MARINA MUNICIPALITY OF KROPIAS

SUPPLY AND INSTALLATION OF A TELEMETRIC SYSTEM FOR THE MONITORING AND AUTOMATIC CONTROL OF THE HYDRAULIC PARAMETERS OF THE WATER SUPPLY NETWORK OF AGIAS MARINA MUNICIPALITY OF KROPIAS

KOROPI TELE_COVER
KOROPI TELE_COVER

DESCRIPTION

 

The aim of the system is the continuous monitoring and supervision of important parameters of the operation of the water supply system (flow, pressure, consumption, energy management…. etc.), the collection and storage of relevant data and the execution of operations to control the active elements of the water supply system.

 

 

The scope of the Contract includes the following works:

 

  •  Detailed Design of the offered integrated system.
  • Supply and installation of (6) Local Water Supply Stations (LWS) at key points of the distribution network in the water supply zones of Agia Marina.
  • Supply and installation of (4) Local Water Supply Stations (LWS) at key points of the distribution network at the interconnections of the water supply zones of Agia Marina, as well as the required equipment where the Network Pressure (PRV) is automatically adjusted, flow and pressure are measured at these nodal points of the zones of the internal aqueduct
  • Supply and installation of (4) Local Data Collection Stations (LDS) at nodal points of the distribution network in the water supply zones of Agia Marina.
  • Supply and installation of (4) telemetric flow & pressure meters at nodal points at the inlets of the water supply zones of the inner aqueduct, and the required equipment thereof.
  • Supply and installation of the electronic hardware (Server, Client, Printers, Communication Manager etc.) of the Central Control Station (CCS).
  • Supply and installation of all communications equipment, including any transponders required for uninterrupted operation of the System.
  • Supply and installation of all instruments mentioned in the study (flow, pressure, etc.)
  • Factory acceptance tests and on-sit acceptance tests (field tests).
  •   Completion tests and delivery of the system.
  • Delivery of drawings, operation and maintenance manuals (documentation).
  •  Training of the service staff in the operation,support and maintenance of the System